Skip to content

SECTOR

IT for Logistics, Warehousing & Transport

In logistics, IT stops being a support function and becomes part of production: if the warehouse Wi-Fi drops, receiving and picking stop. We design networks and wireless for steel racking and cold rooms, with cameras and access control sharing the same infrastructure.

In a transport company or a warehouse, IT is not a support function. It is part of production. When the wireless drops in aisle E, it is not one employee who is inconvenienced: order picking stops, and the delay shows up in the afternoon dispatch.

The problems we see most often

The Wi-Fi was designed for offices. The most common picture: coverage that worked when the warehouse was empty and stopped working once the racking filled up. Steel volume and cold rooms change signal propagation radically. That is why the site survey is done with the space in real operating conditions.

Everything on one network segment. Terminals, scanners, cameras, phones and office computers share one network, with no separation and no priority. The result is camera recording competing with the WMS for the same bandwidth.

The ERP gets blamed for everything. In most inventories we run, the instability attributed to the ERP originates in the network: marginal uncertified cabling, a switch with no PoE headroom, or a provider circuit with no backup.

One internet line, no redundancy. In a business that invoices and dispatches electronically, a line fault is an outage. The same applies to the phone system if no failover route has been defined.

Cameras that record but do not help. In a space with loading and unloading, resolution and retention days determine whether the footage answers a damage or loss question. They are usually decided casually, after the equipment has been bought.

What proper design means here

Sector requirementHow it is addressed
Coverage in aisles and cold roomsSite survey with the space full, positions and power from measurement
Terminals that roam without droppingCentrally managed wireless, correct access point density
WMS and ERP without instabilityVLAN separation and priority for critical traffic
Cameras and access control on the same infrastructureShared structured cabling, calculated PoE budget, dedicated VLAN
Operational continuityA backup circuit and a failover route for calls
Multiple sitesVPN interconnection, one infrastructure standard at every location

The services that apply

The usual scenario is a single project: structured cabling and business Wi-Fi for the space, a corporate network with VLAN separation, and cameras with access control on the same infrastructure.

From there, day to day operation is covered by an IT support agreement and preventive maintenance, so incidents are caught before they stop the flow.

For transport companies with shipping operations, the same logic extends to maritime IT: separation of operational and crew networks, multiple connectivity channels, and remote support while under way.

When it is worth calling us

The most economical moment is before the space is closed up: while ceilings are open and routes are accessible. The second best is the moment you are thinking of adding two more access points, because that is almost never the answer.

Frequently asked questions

Why do warehouse terminals keep losing connection?

Usually because coverage was designed for offices and the racking filled up later. Steel absorbs and reflects the signal, and mobile terminals lose their session as they move between aisles. The fix is not more transmit power but the right number and placement of access points.

Can one network carry WMS, cameras and telephony?

Yes, and it should be designed that way. The condition is VLAN separation and priority for critical traffic, so camera recording does not degrade WMS performance or the other way round.

How long does a new warehouse installation take?

A full IT setup, meaning cabling, network, Wi-Fi, phone system and Microsoft 365, typically completes in 2 to 4 weeks from signature. Structured cabling for up to 30 positions needs 3 to 7 working days on site.

Do you work along the Aspropyrgos, Magoula and Elefsina axis?

Yes, it is one of the areas we work in regularly, based in Attica with immediate coverage of the metropolitan area. We take on projects throughout Greece and in Cyprus.

NEXT STEP

Request a survey at your site

We measure in the real space, with the racking full, and deliver a study with at least two costed options.

GET IN TOUCH

Tell us what you need

Four fields. An engineer replies, not a sales desk.

Fields marked * are required.

By sending this form you accept the processing of your details under our Privacy Policy.