Skip to content

Networks & Infrastructure

Structured Cabling

We design and install Cat6 and Cat6a structured cabling for offices, warehouses and production areas. Routes and rack position are decided before any cable is pulled, every run is certified by instrument, and every outlet and patch panel port is labelled. Handover includes a network diagram and configuration files.

Who it is for

  • Businesses cabling a new space or extending an existing one
  • Warehouses and production areas with demanding cable routes
  • Companies whose cabling is unlabelled and untraceable
  • Sites preparing for cameras, access points and telephony on one infrastructure

When we are NOT the right choice

  • If cabling is requested without design or run certification
  • If the job is one or two outlets in a residence
  • If there is no site access before work starts

PROCESS

The process

Indicative times from signature of the proposal, subject to hardware availability. Every project is shaped to the size and the needs of the client.

  1. 01Site survey and outlet count

    We walk the site with the floor plan, count workstations and network points, identify containment routes and fix the rack position.Time: 2-5 working daysDeliverable: Floor plan with workstations, outlets and rack position

  2. 02Design before any cable is pulled

    We design the logical topology, meaning VLANs, addressing and policies, so the cabling serves the network that will run on it.Time: Alongside the studyDeliverable: Logical topology with VLANs and addressing

  3. 03Two costed options

    We present at least two alternatives, typically Cat6 against Cat6a or a different rack position, with the trade-offs of each.Time: 3-7 working days after the surveyDeliverable: Itemised quotation separating materials and labour

  4. 04Installation and certification

    Routing, terminations, patch panels and rack organisation. Every run is certified with an instrument and every outlet and port is labelled.Time: 3-7 working days on site for up to 30 positionsDeliverable: Every run certified by instrument

  5. 05Handover with documentation

    We hand over the network diagram, the outlet to patch panel mapping, and the configuration files for the active equipment.Time: On completionDeliverable: Network diagram, labelling schedule and configuration files

What is includedWhat is not included
Site survey and network point countBuilders work, core drilling and redecoration
Logical topology design before installationElectrical installation beyond the rack power supply
Routing, terminations, patch panels and rack organisationSuspended ceilings and containment installed by others
Instrument certification of every runActive equipment, unless explicitly quoted
Labelling of every outlet and every port
Network diagram and configuration files at handover

Technology and equipment

  • Cat6 / Cat6a
  • Fibre optic
  • Patch panels and racks
  • MikroTik
  • Ubiquiti UniFi
  • Omada / TP-Link

From practice

The most common finding on an existing site is cabling without labels: nobody knows which outlet lands on which port, and every fault becomes an investigation rather than a repair. That cost is invisible on installation day and visible every time something has to change.

This is why we design the logical topology before the first cable is pulled and hand over the mapping table with the project. In warehouses, where steel racking and cold rooms complicate both cabling and wireless, rack position and routes are the first decisions made.

Prerequisites

  • Site access for the survey, and floor plans where available
  • A finalised workstation layout
  • Containment or ceiling routes ready where required
  • Power supply at the rack position

Cost

Charged per network point, with materials and labour itemised separately, following a site survey. There is no price list, because two sites with the same number of positions can differ substantially in routing difficulty.

We do not publish a price list. Every proposal follows a site survey and separates hardware from labour.

What moves the cost

  • Number of network points and route lengths
  • Cable category, Cat6 or Cat6a
  • Routing difficulty, working heights and existing containment
  • Whether a new rack is needed or an existing one reorganised

Frequently asked questions

Cat6 or Cat6a?

It depends on run lengths, whether speeds above 1 Gbps are expected on that run, and the environment. We recommend per run inside the quotation rather than across the board, because Cat6a costs more and is not needed everywhere.

What does cabling certification mean?

That every run is measured with an instrument rather than simply tested with a laptop. The measurement shows whether the run meets the specification of its category, and it is handed over with the project.

Can the same cabling serve cameras and phones?

Yes, and that is how we design it. Cameras, access points and IP phones share the same structured cabling, separated into VLANs with the switch PoE budget calculated in advance.

How long does installation take?

For up to 30 positions, typically 3 to 7 working days on site. The timeline depends mainly on routing difficulty and whether the space is empty or in use.

NEXT STEP

Request a cabling survey

An engineer counts the points, marks the routes and delivers a quotation with materials and labour itemised separately.

GET IN TOUCH

Tell us what you need

Four fields. An engineer replies, not a sales desk.

Fields marked * are required.

By sending this form you accept the processing of your details under our Privacy Policy.